Description
Addison Engineering were engaged by our client to upgrade their existing plant in to increase production capacity from 2,000 to 3,000 tonnes per year.
A fast track, cut and carve project, this required close involvement with both the client project team and the principal contractor and required precise planning to complete with minimum disruption to production.
Gallery
Project Scope
Our role as Mechanical Contractor involved the fabrication and assembly of pipe work and installation of main plant equipment.